Municipal & Institutional · Glossary
Municipal & Institutional terms
Plain-language definitions of the equipment, plants, permits and land terms used across this site.
This glossary defines the land-management terms used on huntlyland.com in plain language: the equipment that does the work, the invasive plants it removes, and the permits and land rules that shape a scope. Each term links to the page where it matters.
- Basin de-woodying
Removing trees and woody brush from a stormwater basin floor and its embankments, where roots can weaken the embankment and growth can block the outlet.
- Capability statement
A short document a contractor gives public buyers that sets out what it does, its equipment, coverage and how to contract with it.
- Compact track loader (CTL)
A small tracked machine with loader arms at the front that carries interchangeable attachments: mulchers, brush cutters, grapples and buckets. Rubber tracks spread its weight, so it can work slopes, soft fields and lawns that wheeled equipment would rut. Huntly runs a Cat 285XE.
- COSTARS
Pennsylvania’s cooperative purchasing program, run by the Department of General Services, which lets registered local public bodies buy from suppliers on state COSTARS contracts.
- DNREC
The Delaware Department of Natural Resources and Environmental Control, the state agency responsible for wetlands, waterways and the state Phragmites cost-share program.
- Dormant season
Late fall through winter, when deciduous trees and shrubs are leafless. Stems are easy to see, the ground is firm or frozen, and nesting and roosting seasons are past. As general guidance in Pennsylvania, cutting of larger trees is commonly timed to the October 1 to March 31 window, when bats are not roosting in trees.
- Drum mulcher
A mulching attachment built around a horizontal rotating drum fitted with fixed teeth. The drum is lowered onto standing vegetation and reduces it to chips in a single pass, which suits brush, saplings and small trees.
- Erosion and sediment control (E&S)
The measures that keep soil on a site while ground is disturbed: silt fence, stabilized entrances, mulch cover and staged work. In Pennsylvania, earth disturbance of 5,000 square feet or more needs a written E&S plan (25 Pa. Code § 102.4). Whether a mulching scope counts as earth disturbance is a question for the approving body.
- Forestry mulching
Clearing brush, saplings and small trees by grinding them where they stand with a mulching head on a tracked carrier. The chips stay on the ground as a layer that holds soil and slows regrowth, the roots stay in place, and nothing is burned or hauled away.
- Grapple
A clamping attachment that picks up and moves logs, limbs and storm debris, and stacks merchantable timber into a deck for the owner.
See Storm cleanup
- Ground pressure
How much weight a machine puts on each square inch of the ground it stands on, usually given in pounds per square inch (psi). Wide tracks lower it. Lower ground pressure means less rutting and compaction on paddocks, lawns, marsh edges and wet rights-of-way.
- Haul-off
Loading debris or material onto trucks and taking it off the property. Mulching leaves wood on site, so haul-off is needed only for non-organic debris or material the owner wants gone, and it is quoted as its own line.
- High-flow hydraulics
An auxiliary hydraulic circuit that sends a larger volume of oil to the attachment than a standard circuit. Drum mulchers and heavy brush cutters need that flow to run at full speed, so a high-flow machine finishes more ground per day than a standard-flow one.
- Log deck
A neat stack of cut logs at a landing or the road end of a corridor, placed so a truck can load it later.
See Drives and lanes
- Merchantable timber
Logs of a size and quality that have sale value as lumber or pulp. On Huntly work they are decked on the property for the owner rather than ground or hauled away.
See Drives and lanes
- NPDES permit
A permit under the National Pollutant Discharge Elimination System for stormwater from construction. In Pennsylvania, earth disturbance of one acre or more generally needs NPDES permit coverage (25 Pa. Code § 102.5), arranged by the owner or their engineer.
- Right-of-way (ROW)
A strip of land along a road, utility line, drainage ditch or trail that the owner of the right has the legal right to use and maintain. Keeping it clear of woody growth keeps access, drainage and sightlines working.
- Riparian buffer
The strip of trees, shrubs and grasses along a stream, river or pond that filters runoff and holds the bank. Buffer ground is flagged on the site walk and left alone or worked by hand unless the scope and any permits say otherwise.
- Sightline
The clear line of view a driver or rider needs at an intersection, driveway or trail crossing. Sightline work removes the brush and low limbs that block it.
- Site walk
A private walk of the property with the owner before anything is priced or scheduled. It records access, what stays, water and wet ground, and the finish wanted, and a written scope follows it.
See Plan a site walk
Pennsylvania erosion and sediment thresholds: 25 Pa. Code §§ 102.4 and 102.5. Delaware wetlands and Phragmites figures: Delaware DNREC. Definitions reviewed October 30, 2026.
Send the scope. A written quote follows.
hello@huntlyland.comSend the town, rough acreage and two or three photographs. We reply by email with site-walk times, and a written scope follows the walk.
Office hours Monday to Saturday, 8 a.m. to 4 p.m. On call 24/7 for storm and emergency cleanup. If anyone is in danger, call 911 first.